Tianjin Longlong Metal Products Factory
Products
Contact Us
  • Contact Person : Ms. Hou Sophia
  • Company Name : Tianjin Longlong Metal Products Factory
  • Tel : 86-22-26994727
  • Fax : 86-22-26994727
  • Address : Tianjin,Tianjin,International Female Technology Park, Jinwei Road
  • Country/Region : China
  • Zip : 300402

Drywall Metal Stud Roll Forming Machine

Drywall Metal Stud Roll Forming Machine
Product Detailed
Related Categories:Bending Machinery

Detailed Product Description


Detail information of the Dry - wall Metal Stud Roll Forming machinen as follows:

Model no.: LL-CL55-12C

() The production line major technical parameters

1 The use of raw materials: hot dip galvanized steel strip, cold-rolled steel plate

2 Rolling material thickness: 0.35-2.0 mm

3 Feeding width: 300mm

4 The steel coil inner diameter 508mm-600mm

5 Steel coil outer diameter: 1200mm

6 Molding host motor: electromagnetism timing motor 5.5 kw

7 Working voltage: 380V 50hz   control voltage 24v

8 Molding host composed by 12 axis

9 Molding host adopts welded steel structure

10 The transmission way: gear (gear materials selecting 45 # steel processing, surface with high frequency.

11 The roller adopts 45 # steel thermal refining, surface abrasive grinding, modulation hardne HB250 280, roller diameter 55mm

12 Roller mould adopts bearing steel( Gcr15 ) salt bath quenching hardness HRC58- 62

13 Production speed: 5-22 meters per minute

14 The maximum error metal stud molding 0.35 mm

15 Feeding direction from left to right

() Cutting off device

1 Hydraulic as power cut: Cutting off ability 8 tons

2 Hydraulic pressure system pressure12MPA work pressure 6MPA

3 Cut off form : 45 degrees inclined cutting, cutting waste 0mm

4 Cutting stander adopts steel frame welding

5 Cutting off mold adpots special mold steel CR12, Salt bath quenching hardness HRC60-62

6 Scale length error less than 2.0 mm

(decoil) feeding organization

1 Steel structure welding framework

2 Using hand up tight

3 Maximum load 18,000 tons

() The whole production line composition

Vertical feeding organization - material right and left guide material leverer molding hostroller moldfinished goods straightener, hydraulic pressure cutting off device (hydraulic station) -- tracing cut off walking car cutting off mold - accept feeder-- electric control box

() Production cycle: after receiving of the contract prepayment, within 35 days, deliver the goods.

() Equipment acceptance, manufacturers train debugging method: Buyer comes to the factory of the sellers to learn, examine the equipment, room and board undertook by manufacturer, consignment after the examination is passed.

The specification which the production line can produce.

QC50 QC75 QC100 QU50 QU75 QU100 DU38. DU50 DC50

Dry - wall Metal Stud Equipment

Equipment models LL-CL55-12C

() The production line major technical parameters

1 The use of raw materials: hot dip galvanized steel strip, cold-rolled steel plate

2 Rolling material thickness: 0.35-2.0 mm

3 Feeding width: 300mm

4 The steel coil inner diameter 508mm-600mm

5 Steel coil outer diameter: 1200mm

6 Molding host motor: electromagnetism timing motor 5.5 kw

7 Working voltage: 380V 50hz   control voltage 24v

8 Molding host composed by 12 axis

9 Molding host adopts welded steel structure

10 The transmission way: gear (gear materials selecting 45 # steel processing, surface with high frequency.

11 The roller adopts 45 # steel thermal refining, surface abrasive grinding, modulation hardne HB250 280, roller diameter 55mm

12 Roller mould adopts bearing steel( Gcr15 ) salt bath quenching hardness HRC58- 62

13 Production speed: 5-22 meters per minute

14 The maximum error metal stud molding 0.35 mm

15 Feeding direction from left to right

() Cutting off device

1 Hydraulic as power cut: Cutting off ability 8 tons

2 Hydraulic pressure system pressure12MPA work pressure 6MPA

3 Cut off form : 45 degrees inclined cutting, cutting waste 0mm

4 Cutting stander adopts steel frame welding

5 Cutting off mold adpots special mold steel CR12, Salt bath quenching hardness HRC60-62

6 Scale length error less than 2.0 mm

(decoil) feeding organization

1 Steel structure welding framework

2 Using hand up tight

3 Maximum load 18,000 tons

() The whole production line composition

Vertical feeding organization - material right and left guide material leverer molding hostroller moldfinished goods straightener, hydraulic pressure cutting off device (hydraulic station) -- tracing cut off walking car cutting off mold - accept feeder-- electric control box

() Production cycle: after receiving of the contract prepayment, within 35 days, deliver the goods.

() Equipment acceptance, manufacturers train debugging method: Buyer comes to the factory of the sellers to learn, examine the equipment, room and board undertook by manufacturer, consignment after the examination is passed.

The specification which the production line can produce.

QC50 QC75 QC100 QU50 QU75 QU100 DU38. DU50 DC50



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.